Service: Off-Site Manufacturing

Confidential Data Centre, Sweden

PROJECT DESCRIPTION Kirby was appointed as the main mechanical contractor on a hyperscale data centre project in Sweden for a leading cloud computing provider. Project Celsius involved the construction of two new data centres. The mechanical scope of works included supply and install of 25,000m² of ducting to data halls, treated humidifier water system generation …

Confidential Data Centre, Sweden Read More »

Interxion, Ireland

PROJECT DESCRIPTION Kirby was responsible for the delivery of full MEP services for a new 4MW Tier III data centre facility in West Dublin. The project involved the construction of a single storey data centre with services above and plant at roof level, an ESB substation as well as a three-storey office block. The project …

Interxion, Ireland Read More »

Telecity, Ireland

PROJECT DESCRIPTION Telecity Group were converting an existing warehouse facility in Dublin to a 6MW Tier 3 designed Data Centre and Kirby was appointed as lead design and build MEP contractor, with manpower peaking at 120 people. Kirby also led the 3D model development and coordination for the project. We utilised Autodesk Naviswork and Revit …

Telecity, Ireland Read More »

Confidential Data Centre, Netherlands

PROJECT DESCRIPTION Kirby was appointed as the main mechanical and electrical contractor for a data hall in a new facility for a leading data centre provider. Kirby applied Building Information Modelling (BIM) throughout this project and implemented Lean construction principles. All pipework was successfully prefabricated off-site, this optimised project delivery and ensured efficiency. SCOPE OF …

Confidential Data Centre, Netherlands Read More »

Global Switch, Netherlands

PROJECT DESCRIPTION Kirby was appointed to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre. The project involved the integration of services within a live facility, modifications to existing owner furnished equipment and the supply and installation of new …

Global Switch, Netherlands Read More »

Ericsson, Ireland

PROJECT DESCRIPTION This high density Tier 2 data centre solution for Ericsson was delivered entirely as a modular build. Kirby was responsible for the M&E project delivery, including model coordination and off-site manufacture of the containerised data centre, all associated civil works and complete integrated systems testing and commissioning. Kirby prefabricated modularised switch rooms and …

Ericsson, Ireland Read More »

Edwards Lifesciences, Ireland

PROJECT DESCRIPTION Kirby was appointed to complete the electrical scope of works for a new manufacturing facility at Edwards Lifesciences. The project involved the supply, testing and commissioning of the MV / LV systems, Data, BMS and QMS systems. Early contractor engagement ensured the project was delivered safely and on time. BIM was used to …

Edwards Lifesciences, Ireland Read More »

Scroll to Top
Skip to content