Zoetis, Ireland

PROJECT DESCRIPTION Kirby was appointed to complete the mechanical, electrical and CSA scope of works for upgrade works to the existing cleanroom manufacturing area within the Zoetis facility. The project involved mechanical installations including WIFI cooling system and WIFI skid on the process pipework with alterations to the existing pipework, strip out of existing electrical

Zoetis, Ireland Read More »

MSD Biotech, Ireland

PROJECT DESCRIPTION Kirby was responsible for the installation of all electrical services at the new MSD facility CUB (Central Utilities Building), MS & T Lab, Warehouse, Fallow Fit-out and external locations. The new facility plays a key role in the manufacture of biologics-based medicines. Off-site fabrication was utilised on this project which ensured that the

MSD Biotech, Ireland Read More »

Alexion, Ireland

Kirby has completed a number of projects for Alexion Pharmaceuticals at their facilities in Westmeath and Dublin, Ireland. The total value of projects completed for Alexion by Kirby is €35m. Please see below details of two recent projects that Kirby has completed for Alexion.   Alexion Pharmaceuticals BDS, CUB and Warehouse, Ireland MAIN CONTRACTOR: PM

Alexion, Ireland Read More »

GlaxoSmithKline, Irvine, Scotland

PROJECT DESCRIPTION Kirby was appointed as the MEP contractor for a new production capacity expansion for GSK. This project was a combination of new build external areas and building extensions to existing production areas, all undertaken within a live production environment with ATEX/hazardous area zoning. Our work-scope included the fabrication and installation of piping, ductwork

GlaxoSmithKline, Irvine, Scotland Read More »

Schwarz Pharmaceuticals, Ireland

PROJECT DESCRIPTION Schwarz Pharmaceuticals invested €120m at its facility in Clare. Kirby was responsible for the installation of electrical and instrumentation services for the API building, electrical distribution centre, TOU, tank farm, drum store, waste water treatment plant and site services, with manpower peaking at 150. Kirby successfully managed the asset logging of all field

Schwarz Pharmaceuticals, Ireland Read More »

Takeda, Ireland

PROJECT DESCRIPTION Kirby was appointed as the mechanical contractor for a new manufacturing facility for Takeda Pharmaceuticals. The project involved the installation of mechanical and process pipework services in a new laboratory and office space, with total manpower peaking at 116. Kirby implemented Building Information Modelling (BIM) to coordinate project delivery and prefabricated all carbon

Takeda, Ireland Read More »

AbbVie, Ireland

Kirby has completed a number of projects for AbbVie at their facility in Sligo, Ireland. The total value of projects completed for AbbVie by Kirby is €10m. Please see below details of two recent projects that Kirby has completed for AbbVie. AbbVie Building 20, Ireland MAIN CONTRACTOR: Kilcawley Construction CONSULTANT: OSENG PROJECT: Buidling 20 –

AbbVie, Ireland Read More »

Sanofi Aventis, France

PROJECT DESCRIPTION Kirby, in partnership with GDF-Suez Energy Services subsidiary, INEO, delivered the entire electrical and instrumentation work scope for this project; a new €200m cell culture manufacturing facility on a brownfield site. Kirby was responsible for receipt of all instruments, benchmarking prior to release to the mechanical contractor, subsequent cold and hot loop checking

Sanofi Aventis, France Read More »

Astellas Pharma, Ireland

PROJECT DESCRIPTION Kirby was responsible for all mechanical and electrical services associated with a new High Bay Warehouse Facility, including offices, QA/QC area, plantrooms and production area. Manpower on site peaked at 105. Kirby implemented Building Information Modelling (BIM) which ensured the project was successfully delivered and facilitated early client access. SCOPE OF WORK The

Astellas Pharma, Ireland Read More »

Allergan, Ireland

Kirby has completed a number of projects for Allergan Biologics at their facilities in Westport and Dublin, Ireland. The total value of projects completed for Allergan by Kirby is €25m. Please see below details of two recent projects that Kirby has completed for Allergan Biologics. Allergan Biologics MAIN CONTRACTOR: Sisk CONSULTANT: RPS Engineering PROJECT: Biologics

Allergan, Ireland Read More »

GW Pharmaceuticals, England

PROJECT DESCRIPTION Kirby was responsible for the full 3D coordination and construction of mechanical, electrical/instrumentation and process pipework services for this project, which was an extension of an existing manufacturing facility. The project consisted of a production suite and laboratory which included the installation of an extraction skid and evaporator skid. Kirby engaged with WSP

GW Pharmaceuticals, England Read More »

Janssen BioCork 2, Ireland

PROJECT DESCRIPTION Kirby was appointed as the mechanical contractor for a new manufacturing facility for Janssen. This project involved the construction of a new building with a total floor space of 20,000m². In addition to this the existing warehouse, laboratory administration building, support infrastructure and utilities were also expanded to support increased manufacturing capacity. Kirby

Janssen BioCork 2, Ireland Read More »

Bio Products Laboratory, England

PROJECT DESCRIPTION Kirby was appointed as MEP contractor for the installation of a new production line for processing plasma products within an existing manufacturing facility. Kirby implemented LEAN construction techniques throughout the project and prefabricated CHW and LPHW pumps skids. This minimised interruption to the client and optimised efficiency. SCOPE OF WORKS Kirby scope of

Bio Products Laboratory, England Read More »